100_6653.JPG

WATER SUPPLY SYSTEMS MANAGEMENT, OPERATIONS AND MAINTENANCE

Flo-Max Australia holds long term contracts to ensure the water supply to open cut and underground coal mines, along with the associated townships. We have maintained continuity of supply with no lost downtime to the mine or township during the contract term.

These contracts hold Flo-Max responsible for the pipeline and pumping station management and operation 24 hours a day, 365 days per year. Annual operation and maintenance budgets are prepared and presented to the owners as part of the contract responsibility. The systems managed incorporate hundreds of kilometres of pipeline, associated high lift pumping sets, telemetry control systems, surface and bore pumps, balance tanks and major storages.

All maintenance is recorded against each component of the system and a report is submitted to the principal on an agreed timeframe. This total quality approach by Flo-Max is compiled as a complete documented record for the system, over the life of the contract.

 

Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube.